Project: Alma Farms Subdivision
Client: Old 30 Investments, LLC
Location: Onslow County, NC
Stroud Engineering is currently planning a 147 lot residential subdivision for entry level housing. The development will require a wastewater treatment plant with a high rate infiltration basin and a groundwater lowering system. Stroud’s responsibilities include:
- R-10 Rezoning
- Special Requirement for wastewater treatment facility
- Sketch Plan approval through Onslow County
- Preliminary Plan approval through Onslow County
- North Carolina Division of Water Quality permitting
for a Wastewater treatment Plant capable of treating
53,000 gallons per day
- Infiltration and Dewatering design for the effluent
- Design and permitting of highway access
- Design and permitting of public roads
- Design and permitting of a sewage collection system
- Design and permitting of water distribution system
- Design and permitting of a high density storm water system to satisfy North Carolina Division of Water Quality Coastal Storm Water Management rules
- Construction administration and inspection